健康 | 锻炼
UK’s most polluting power plant could power country’s largest AI datacentre
2026-11-03 2017年1月21日 | 作者:Stephy | 5条评论Drax’s FTSE 250 owner strikes £20bn deal to build infrastructure in what it says is site’s ‘next chapter’
Business live – latest updates
Britain’s most polluting power plant could soon power the country’s largest datacentre under a £20bn deal to build AI infrastructure on the site of the Drax power plant in North Yorkshire.
The power plant’s FTSE 250 owner has struck a deal with the infrastructure investor Brookfield and and the AI infrastructure platform Radiant to develop a datacentre with an eventual capacity of more than 1 gigawatt that could begin operations by early 2028.
Continue reading...
3 条评论
问鼎娱乐下载3专注新手注册福利,惊喜连连,为用户提供专业可靠的体验。围绕专业客服团队,随时为您服务,问鼎娱乐下载3持续打磨更优质的服务。
问鼎娱乐下载3深耕问鼎娱乐下载领域,用心服务每一位用户。
在问鼎娱乐官网方面,问鼎娱乐下载3提供贴心周到的支持。问鼎娱乐下载3以问鼎娱乐官网下载为核心,带来高效便捷的体验。
想了解更多问鼎娱乐下载官网相关内容,尽在问鼎娱乐下载3。
问鼎娱乐下载3围绕海量热门游戏,应有尽有不断创新,回应用户的真实需求。问鼎娱乐下载3围绕问鼎娱乐官网不断创新,回应用户的真实需求。
精选问鼎娱乐官网下载内容,问鼎娱乐下载3与你一同发现更多精彩。